1. We initiate the repair with NDT pre-inspection, identifying the damage and providing an overview of the state of the turbine.
2. To simulate and identify which parts of the turbine that are exposed and critical regarding loads and fatigue areas, which leads to an inspection protocol.
3. If any findings have been detected during the inspections, these will be repaired in order to bring the turbine into an operative condition with the possibility of prolonging the turbine’s life.
4. After the repair solution is implemented, we perform a post inspection to ensure the repair delivers the planned result, before handover.